• Professional Development
  • Medicine & Nursing
  • Arts & Crafts
  • Health & Wellbeing
  • Personal Development

Course Images

PV301L: Solar Training - Solar Electric Lab Week (Battery-Based)

PV301L: Solar Training - Solar Electric Lab Week (Battery-Based)

  • 30 Day Money Back Guarantee
  • Completion Certificate
  • 24/7 Technical Support

Highlights

  • On-Demand course

  • All levels

Description

Students who complete the PV301L workshop will be able to:

  • Identify and describe the basic functions of each component in a PV system

  • Describe the configuration of various types of PV systems: PV direct, Stand-alone, PV/hybrid, Multimode, Zero-sell, Micro-grid, Utility-scale energy storage

  • Calculate the capacity & voltage of different batteries

  • Determine the state of charge of a battery by testing voltage and specific gravity

  • List safety precautions & equipment required to work with batteries

  • Demonstrate safe procedures for connecting and disconnecting batteries

  • Demonstrate the process of adding water to batteries

  • Identify appropriate battery enclosures

  • Diagram and wire battery banks in series and parallel configurations, given various system parameters

  • Make cables and lug connections for battery wiring

  • Install temperature sensors on batteries

  • Wire the battery bank for a live system

  • Wire and test charge controllers through the various stages of operation

  • Install and test PWM and MPPT charge controllers

  • Program MPPT charge controllers based on battery and array values

  • Wire and program battery SOC meters in different PV system configurations

  • Set up and operate batteries during bulk, absorption, float, and equalization cycles

  • Describe how maximum power point tracking and voltage step-down affect a PV system

  • Identify some features, options, and metering available on different types of battery chargers

  • Identify appropriate inverter types for different battery-based system configurations

  • Compare available features and capabilities of battery-based inverters

  • Identify specifications critical for battery-based inverters

  • Wire test and program battery based inverters

  • Discuss when and why breakers would be used rather than fuses

  • Use a 3-line diagram to wire a system

  • Discuss the order and perform safe installation practices

  • Demonstrate the order of safe commissioning

  • Demonstrate the order of shut-down and how to establish an electrically safe working environment

About The Provider

Solar Energy International empowers students, alumni, and partners to expand a diverse, inclusive, well-trained and educated solar workforce and spread th...
Read more about Solar Energy International (SEI)

Tags

Reviews