Booking options
£113.74
£113.74
On-Demand course
All levels
The step-by-step process walks through all the requirements to design 2011 NEC compliant systems. This process applies to all circuits in grid-direct PV systems, regardless of size. Developed in conjunction with industry experts and extensively peer reviewed, SEI's wire sizing methodology takes the mystery out! Full coverage of all NEC Article 310 and 690 conductor and overcurrent device sizing.
Join SEI instructors Brian Mehalic and Rebekah Hren for a three-hour on-demand training training session.