Booking options
£113.74
£113.74
On-Demand course
All levels
Solar Energy International discusses the following topics:
Are you are using the best temperature data to calculate maximum system voltage?
Have you reviewed new requirements for labeling, marking and routing conductors?
2011 grounding and bonding requirements have been greatly simplified!
Wondering about the DC arc-fault protection devices now required?
Don't forget that PV source and output fuses now require disconnects within sight!
SEI instructors Brian Mehalic and Rebekah Hren also discuss the following topics:
The code-making process, looking to 2014, Articles 90.1(B) and 110.3,
690.4(B) Qualified persons
690.8(B)(1) and (2) Overcurrent devices and conductor ampacity
690.13 Exception 2 - Disconnecting means - all conductors
690.31(E) DC circuits inside a building - Type MC, distance from decking, marking
705.12(A) Size limits of parallel production sources