• Professional Development
  • Medicine & Nursing
  • Arts & Crafts
  • Health & Wellbeing
  • Personal Development

292 Educators providing Fabric courses delivered On Demand

Imagine! Belfast Festival of Ideas & Politics

imagine! belfast festival of ideas & politics

Belfast

The 8th Imagine! Belfast Festival proved to be a successful offering involving 147 events and 359 speakers & performers during 21-27 March 2022. The eclectic week of talks, workshops, theatre, poetry, comedy, music, exhibitions, film and tours attracted an audience of 9,210 online and in-person attendees. Most of the events (82%) were free as the festival returned to live events after two years operating online. Although Covid continued to impact on our programme with 17 events cancelled due to illness, we were still able to roll out a huge range of events including headliners such as Michael Ignatieff, Tom Robinson, Helen Thompson, Michael Longley, Ece Temelkuran, Bill Neely and a host of exciting arts and cultural events – with many sold out or oversubscribed. We have conducted a comprehensive evaluation of the festival through an audience survey(3.5% sample). Our survey found that 95% of respondents felt the festival satisfied their expectations. It was particularly pleasing to find that 60% of audience members were attending a festival event for the first time and 37% of the sample had never been to a festival venue before, which suggests that we were able to reach new audiences and introduce them to new venues and partners. Other outcomes included: 12% of attendees came from outside Northern Ireland. Of these, 13% stated the festival was the main reason they were visiting Belfast. Audience spend: Our sample spent an average of £35 attending our events Number of festival partners: 52 Number of international participants: 40 with 27 events organised by participants from outside UK & Ireland Number of free events: 121 – 82% of total events Average ticket price: £7.8 Number of workshops: 14 Number of venues used: 35 Media coverage: Total number of items: 98. Reach: 4,022,796. AVE: £181,881. PR value: £545,644 Positive feedback was also elicited from survey respondents, detailed as follows: 95% of respondents felt the festival satisfied their expectations with only 1% reporting dissatisfaction (increased from 94% in 2021) 95.3% of people answered the question ‘after attending the festival, would you be more likely to attend other politics-related events’ (88% last year) 97.8 of respondents stated they were more likely to recommend the festival to family and friends after attending one of our events with 1.6% stating they felt the same When asked whether the festival promotes Belfast and Northern Ireland in a positive way, 98.4% said yes, with 1.6% responding as ‘don’t know’ People appeared to be reasonably well informed about the festival. 92% of the sample stated they were either well or somewhat informed about the festival prior to attending an event Respondents overwhelmingly found the subject matter of the event/performance as the main reason for attending the festival. However, familiarity with the speaker/performer was also cited as a factor. We also asked whether respondents considered themselves to be disadvantaged and found that 21% of the sample considered themselves to fall into this category which suggests were able to significantly engage with vulnerable and less well-off sections of the community. We invited the public to suggest and organise events in November 2021 and received a record 98 proposals, most of which we were able to support. This was a higher than expected level of public participation in the festival which resulted in more events than planned taking place in the 2022 programme. We also had a greater variety of events with more place-making events, exhibitions, music and discussions/workshop events compared to previous years.

Metal Cladding & Roofing Manufacturers Association

metal cladding & roofing manufacturers association

Newport Gwent

MCRMA HOME Welcome to the Metal Cladding and Roofing Manufacturers Association web site! A NEW MEMBER FOR MCRMA! MCRMA extends a warm welcome to Blueprint who offer a comprehensive in-house design and detailing service covering all aspects of the development and engineering of the building envelope.GD40 EXPLAINED IN ONLINE WEBINAR This webinar from A. Proctor Group introduces and discusses the content of MCRMA Guidance Document GD40 – Understanding membranes in ventilated rainscreen facades. ADVICE NOTE BRINGS CLARITY TO AD-L2 MCRMA has published an Advice Note AN 09 The Building (Amendment) Regulations Guidance 2021. This advice note addresses ambiguities in the new Approved Document AD-L Volume 2 Buildings other than dwellings which MCRMA has identified in comparison with previous versions of the Approved Documents.CPD MODULES ON SUSTAINABILITY Four CPD modules have been added to the MCRMA online CPD programme. All are based on the recent guidance document ‘Sustainability and durability of metal roofing and cladding systems’ and cover a range of topics including sustainability, recyclability, life cycle costings and durability.DID YOU KNOW? All MCRMA publications are free to download without any restrictions! MCRMA believes that it is essential for technical information to be made as widely available as possible – visit the publications page.NEW! THE AUTUMN EDITION OF METAL MATTERS – OUT NOW This issue features an article on cavity barriers and fire stopping in which we examine how effective fire stopping and cavity barriers are essential elements of fire protection to restrict the spread of smoke or flames, and to maintain compartmentation . This issue of Metal Matters also features case studies from A.Proctor Group, Architectural Profiles, BTS Facades & Fabrications, Euroclad Group and Rockwool, Contact the MCRMA Follow us on Find us on The MCRMA was formed in 1990 to support the systems manufacturers in the emerging metal cladding and roofing industry. Since then MCRMA has evolved to encompass the needs of component manufacturer suppliers, stockholders, systems installers, independent roofing and cladding inspectors plus industry support services providers, all providing independent building envelope solutions for metal-based roofing and cladding systems, products and services. MCRMA publishes a wide range of guidance documents and articles which reflect the latest developments in the specification and manufacture of metal building envelope systems and their components. All MCRMA publications are free to download. A new MCRMA guidance document GD39 Sustainability and durability of metal roofing and cladding systems focuses on sustainability from a ‘fabric first’ approach where the metal building envelope provides a long-lasting solution which can be future proofed for potential changes of use of the building. As there is a natural split between sustainability and durability topics the MCRMA guidance document is published as a suite of eight standalone sections each of which covers specific but interrelated subjects, including sustainability background, zero avoidable waste, environmental assessment methods, durability, life cycle/whole life costing, products and components. The document can be downloaded from the sustainability page. MCRMA has published a new Advice Note AN 09 The Building (Amendment) Regulations 2021 Guidance. This advice note addresses ambiguities in the new Approved Document AD-L Volume 2 Buildings other than dwellings which MCRMA has identified in comparison with previous versions of the Approved Documents. Advice Note AN 06 Safe working practices on roofs: the distinction between ‘walkable’ and ‘non-fragility’ has been produced to remind all those involved in roof work construction that they have a responsibility to be aware of the most up to date advice on safe working practices and also to be compliant with the legal requirements. Guidance document GD 32 Self drilling fastener installation tools explains that screw guns are an installer essential when working in roofing and cladding construction, as they ensure that the optimum mechanical performance of a self-drilling fastener is obtained, guaranteeing the integrity of the building envelope. Impact drivers should not be used! Their repetitive impact action can lead to drilling failures, reduce the fastener pull-out performance, and damage the coating or strip the moulding on the fastener head.